Once I’d done the initial clean up and played Tetris with all the stuff I had stored in the cave it was time to knuckle down and finish the walls in the workshop side of the cave. No shortcuts here, it was a systematic attack consisting of attaching wood beams to the inner structure, insulating the walls and roof, and then drywall over the top.

You get the idea. After a few days of repeating the process it was finally time to sand down the plaster and get some primer on.

It’s great to be back underway with the build and seeing some progress.

Stay posted for more. Thanks for looking, dan.