Time to start decorating
Having finished off the main wall in the bar area, I could finally start getting some of my memorabilia out …
Having finished off the main wall in the bar area, I could finally start getting some of my memorabilia out …
It was now time to turn my attention back to finishing off the walls, and also starting to think about …
On the opposite side of the floorboard area, my plan is to mount a TV and have some shelves for …
The bar was now in a stage of completion where I could start thinking about fitting the panels of ply …
With the bar nearing completion, I turned my attention to the bulkhead for above the bar back. My goal with …
With the bar build finally well underway, I wanted to start constructing the bar counter and an overhanging bulkhead for …
Having finished the lower level of the bar counter it was time to start building up the bar back and …
The name of my bar is going to be “The Blue Voodoo Lounge”. Stolen from the name of a small …
At long last I’m finally on to the build of the heart and soul of the cave, the bar. It …
I’ve always been a huge fan of skins from things like snakes and crocodiles, and any other types of leather …
Time to put some Gyprock on the walls of the gym area, and then section it off from the workshop …
final coat of varnish – finished!
second coat of varnish
first coat of varnish
sanding the edges of the floor boards
Sanding the floor boards
preparation for floor sanding
laying the floor boards
laying out the border in jarrah
laying out the boards for the bar area of the cave